2018 06 18 Floor, HVAC, Stairs, Landscape ..

2018 06 18 Floor, HVAC, Stairs, Landscape .. 

The last of the floor gets the final coat of finish.  All of the prep work takes far more time than the actual application of the finish, which is very fast.  The first few photos show parts of the house where the floor is done, the next few show work in progress.  After this it will be socks or booties for everyone..

A few shots of finished floor:





Last coat of finish is basically poured on the floor and carefully pushed into place with tools with soft heads that look sort of like squeegees but aren't.



Just after the last coat of finish is done.  You can see it is wet.


Work on the risers and treads for the studio staircase begins .. 


The space between the gabion walls and the house is filled for planting.  All of this will be done with low (very low) maintenance natives.



Work continues charging the ground source heat pump system.  The first thing that happened at the site was drilling the wells that form the heat exchanger in system.