Nevada House Build
Thursday, June 7, 2018
2018 05 08 Floor, Fixtures, Cabinets
2018 05 08 Floor, Fixtures, Cabinets
Flooring continues, fixtures installed, cabinets arriving ..
And the concrete pad is done, but not fully set.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment