Thursday, June 14, 2018

2018 06 13 Paint, Floor, HVAC

2018 06 13 Paint, Floor, HVAC 

The final coat of paint; all the little blue tape flaws are disappearing.

All but the stair treads are done, so the floor is being prepared for the final finish.

And the ground source heat pump is being charged so the heating/cooling can be started up.






The east end of the house under the MBR deck.   We decided to put rusting steel here as well..  The space between the glass rail and the deck has yet to be flashed with the same steel.