2018 05 04 Concrete Drive, Flooring
Half the concrete pad in front of the garage and utility area is poured, and flooring work continues.
The concrete has a color that is meant to be close to some of the rock in the gabion walls, which all came from the site. I was not able to photograph all the grading work.
The two steel posts are part of the rolling gate. It will have a big concrete footing.
All the concrete in the utility area had to be brought over in a wheelbarrow.
The gate footing again.
The gate footing again, again.
Meanwhile, the floor progresses.
The pieces of blue tape on the walls mark small flaws.