2016 12 08 Framing, Sheeting ..
Framing and sheeting continues. At this point I don't think any framing work is being done on the exterior, it's all interior work.
Maybe an inch of snow fell overnight, and by the middle of the day it was gone. It all came off the roof in a watery mess within about 5 minutes in the middle of the morning, south side first.
Below is one of the "bridges" that separate the 4 basic blocks of the house. This is between the living space and the guest bed/bath and guest/office spaces to the west. These bridges are short "hallways" that are glass on the north and south sides, and maybe 6 feet wide.
Below, looking east along the deck on the south side of house.
Below, looking west along deck on south side of house.
Below are three general views of the property. I am looking forward to just watching the weather. In the summer there will be thunderstorms occasionally, and in the winter there will be the bigger storms coming in from the west. It can be extremely windy at the site.