2018 02 09 Gabion Walls, Sheetrock, Tile, Underneath ..

2018 02 09 Gabion Walls, Sheetrock, Tile, Underneath .. 

Gabion walls progress, sheetrock work is almost done, tile work progress in baths, and some more shots of all the systems under the floor..

Kitchen area.  Kitchen island/counter ends at the fireplace block, about where the trashcan is now.  The lower part of the floor will be concrete.


Another look at fireplace.


Guest room:


Studio space:


Mezzanine in studio space:


A few shots of exterior courtyard / parking area:



Trellis leading to front door:




The two pumps for the ground source heat pump system will be in the open space to the left of the red valve assembly.  These pumps will move the fluid that does the heat transfer in the heat pump.  All of the copper pipe is part of that closed system.