2018 01 10 Cedar Ceiling, Exterior, Underneath ..

2018 01 10 Cedar Ceiling, Exterior, Underneath .. 


Work continues on the cedar ceiling.  I also include a few exterior shots, and a couple underneath the floor.  All of the HVAC, a lot of electric, all of the plumbing, and some of the lighting control is under the floor.






Below is the start of the gabion wall that will be behind the solar array.




The following is one of the "water furnaces" that are part of the ground source heat pump system.