Saturday, December 5, 2015

2015 11 30 Digging and Drilling ..


Here are a few snaps from Nov 30 at the house site.  

The drilling is for the ground source heat pump.  There will be 12 300’ holes.  The driller is getting about 1 per day done.  The last shot shows the tubing loop that goes in each hole.  The other work is excavation for the foundation and crawlspace under the house.  The three conferring over plans are the general contractor (dark knit cap), civil engineer (baseball cap) and excavating subcontractor (mostly hidden)










.

No comments: