Tuesday, March 6, 2018

2018 03 06 Mud, Lights, Tile, Cabinets, Gabion Wall ..

2018 03 06 Mud, Lights, Tile, Cabinets, Gabion Wall .. 

Warmer temperatures mean all the snow is going to water, therefore mud.  It's a mess.

Light fixtures are being installed, tile work proceeds in baths, the cabinet maker showed up with a lot of cabinets, and the remaining gabion wall is getting closer to completion.

Heads going on to some of the tracks.  This one will have more.   I'm glad everything in the house will be LED.  I don't want to go up there to be changing anything..



I like the way the exterior is weathering.


Guest bath tile.


A load of cabinets shows up.



Mud.  A lot of mud.


The last gabion wall to complete.  This is looking SE.  The wall will be on the north side of the solar array.


More mud.