2017 01 30 Interior framing, Electrician ..

2017 01 30 Interior framing, Electrician ..

First shot below, beginning to frame the low wall along the studio mezzanine.  This will run above the ladder as well.  If you look closely in all of these photos you will see signs that the electricians are starting to pull wire.  So far most of their work has been below the floor.


Below, two shots looking at the chase at the west end of the gallery area.  This will be full of electrical and HVAC.



Below, looking southeast from the guest bedroom.  I just like this shot.


Below, looking east in the main living space.  The kitchen/pantry area is being framed to the far left.