2016 03 15 Stem Wall Forms, Closing Up ..
At this point the stem wall forms and rebar have been inspected and they are being closed up on the inside, in preparation for concrete in a few days.
A lot of work went into these forms. There are a lot of utilities that pass through them, the stem walls hold a lot of anchor bolts and other structures, the floor heating vents have to be accommodated, the mud sill has to be anchored. And all of the rebar had to be wired together.
Main living part of house, from north side, looking southeast.
Entrance to house will be here, looking southwest from north side of house.
Deck on south side of house is to right, main living area to left.
Main living area of house, looking east from south side.
Looking east along axis of house; studio end.
Garage and storage on north side of house.
Studio end of house, looking southeast.
Looking west along axis of house from crawlspace.
Closing inside of forms in main living part of house, from in crawl space.
Closing up forms in west end of house, from in crawl space.
Closing up forms in utility room, taken from top of forms.
Looking east along axis of house.
No comments:
Post a Comment