2016 03 14 Stem Wall Forms, Rebar ..
Three weeks have gone by, and the stem wall forms are almost done. The exterior walls are built up, the rebar structure is added, and then the work is inspected before the interior walls of the forms are built and they are ready to pour concrete.
Looking east along the east-west (more or less) length of the house.
Looking east along south side of house, deck to right.
Inside the utility room.
No comments:
Post a Comment