Wednesday, February 14, 2018

2018 01 26 Fireplace Framing ..

2018 01 26 Fireplace Framing .. 

The fireplace in the living space is freestanding and open on three sides. The island in the kitchen adjoins the west end of the fireplace.  The fireplace itself has glass faces.  The whole thing is build inside a steel frame.









2018 01 12 Cedar Ceiling, Electric, Exterior ..

2018 01 12 Cedar Ceiling, Electric, Exterior ..

More work on cedar ceiling (not shown), electric, some exterior shots.





2018 01 10 Cedar Ceiling, Exterior, Underneath ..

2018 01 10 Cedar Ceiling, Exterior, Underneath .. 


Work continues on the cedar ceiling.  I also include a few exterior shots, and a couple underneath the floor.  All of the HVAC, a lot of electric, all of the plumbing, and some of the lighting control is under the floor.






Below is the start of the gabion wall that will be behind the solar array.




The following is one of the "water furnaces" that are part of the ground source heat pump system.