2018 04 30 Pool, Deck Pavers, Floor, Grading ..
More work on the pool, south deck pavers. Flooring continues. Grading for concrete and drainage is done.
A load of flooring ..
Counters, covered with blankets and plywood. Will see them soon..
Concrete tiles in front of fireplace and through kitchen area.
East deck, finished, waiting for glass rail.
South deck, in progress.
Graded, waiting for concrete.
Thank you for another great article.
ReplyDeletepool deck Wellington