2018 04 04 Fixtures, Tile, Grading, Night ..
More work on fixtures, last part of the tile work, grading starts on the remaining flat concrete [no photos of this today].
Now that most of the fixtures are in and the house is powered I made my first visit to the site at dusk.
Some of the track lights will have to be adjusted, some added. It will be a process..
[These were all hand held mostly in fairly low light. I will go back with a tripod on another evening. The sky was gloomy since a storm is moving in. Next time on a fair night!]
No comments:
Post a Comment