2018 04 04 Fixtures, Tile, Grading, Night ..
More work on fixtures, last part of the tile work, grading starts on the remaining flat concrete [no photos of this today].
Now that most of the fixtures are in and the house is powered I made my first visit to the site at dusk.
Some of the track lights will have to be adjusted, some added. It will be a process..
[These were all hand held mostly in fairly low light. I will go back with a tripod on another evening. The sky was gloomy since a storm is moving in. Next time on a fair night!]
Thursday, April 5, 2018
2018 04 03 Fixtures, Tile, Pool, Shadows ..
2018 04 03 Fixtures, Tile, Pool, Shadows ..
More work on fixtures, tile, pool, and some more shadows.
Tile work on studio bath, almost done.
Some more shadows..
The solar array field.
More work on fixtures, tile, pool, and some more shadows.
Tile work on studio bath, almost done.
Some more shadows..
The solar array field.
2018 04 02 Fixtures, Tile, Shadows ..
2018 04 02 Fixtures, Tile, Shadows ..
Install of light fixtures continues, tile work close to completion, some more shadows..
Starting to install tile around pool ..
Some more cool shadows ..
Install of light fixtures continues, tile work close to completion, some more shadows..
Starting to install tile around pool ..
Some more cool shadows ..
Subscribe to: