Sunday, December 17, 2017

2017 12 11 Louver Trim, Sheetrock, Cedar Ceiling, Trellis ..

2017 12 11 Louver Trim, Sheetrock, Cedar Ceiling, Trellis ..

Work on the steel and aluminum trellis that extends north from the front door begins.   One of the photos shows a set of the bolted joints in the trellis.  The bolts are torqued by putting a power tool on the bolt end and spinning the bolt into the nut.  The bolts are engineered with varying strengths so they snap off with the desired torque.

The roofers are back to add trim to the edges of the louvers.  The initial method of doing this was not as "discreet" as it might have been, the new method it much better.  The edges disappear..

More sheetrock work, more cedar ceiling .. 














No comments:

Post a Comment