2017 10 23 Sheetrock, grading ..

2017 10 23 Sheetrock, grading ..

Sheetrock work, grading around the walkway and trellis foundation.  The small trench compactor in the second and third photo is run with a remote control, which looks like fun.  All the remaining dirt that was taken out of the foundation dig is being "exported".  The remaining rock will go into the gabion walls that are not yet built.