2016 01 05 GSHP buried .. The ground source heat pump "plumbing" was all buried today. There is about 1.5 miles of tubing in the ground in the 12 300 foot deep holes that were drilled last month. They are tied together into a continuous loop of tubing.
No comments:
Post a Comment