2017 11 04 Louvers arrive, drain work ..
The aluminum louvers arrive. These go in the "gaps" in the roof.
Work continues on the drain field on the west side of the house.
Thursday, November 16, 2017
2017 11 01 Sheetrock, excavation ..
2017 11 01 Sheetrock, excavation ..
Work continues on the sheetrock, and the drains that run around the west end of the house..
Work continues on the sheetrock, and the drains that run around the west end of the house..
Wednesday, November 1, 2017
2017 10 31 Sheetrock, excavation ..
2017 10 31 Sheetrock, excavation ..
Sheetrock work continues. It is very interesting to see how this changes the feel and apparent size of all the spaces. Everything seems larger. One of the electricians commented on this too.
All of the interior walls were insulated before the sheetrock was started. It's really quiet now.
Last photo is the landscape off the SE corner of the house. The light is wonderful when the sun is low in the sky.
Sheetrock work continues. It is very interesting to see how this changes the feel and apparent size of all the spaces. Everything seems larger. One of the electricians commented on this too.
All of the interior walls were insulated before the sheetrock was started. It's really quiet now.
Last photo is the landscape off the SE corner of the house. The light is wonderful when the sun is low in the sky.
Subscribe to:
Posts (Atom)












